Friday, December 11, 2009

How To Cover Pockmarks

Marcado CE en andamios tubulares ?

For a while there is some controversy with the requirement of CE marking tubular scaffold. This situation has been encouraged partly by the enactment of Royal Decree 2177/2004, which introduces the need for development of Mount Plan, and Removal Using for the following types of scaffolding:

1. Suspended Access Platforms (manually operated or motorized), temporarily installed on a building or structure for specific tasks, and Mast climbing platforms. (This first type of scaffolding will be subsequently released from the implementation of the Plan of rigging actually be machines, which should incorporate mandatory CE marking).

2. Scaffolding made with prefabricated elements resting on natural ground, concrete floors, ceilings, overhangs or other elements whose height from the lowest level of support until the coronation of the scaffold, more than six meters or horizontal elements have saved flights and greater distances between supports of more of eight meters. With the exception of scaffolding trestles or axle stands.

3. Scaffolding installed outdoors on roofs, domes, roofs or overhead structure with a distance between the level of support and level the ground or floor exceeds 24 meters.

4. Torres access towers and mobile work in which work is carried over six meters from the point of operation to the ground.

Royal Decree 2177/2004 exempts from the preparation of this Plan of Installation if:

()... case of scaffolding, despite being included among those cited above, have the CE marking, on being application specific rules on marketing, that plan may be substituted for the specific instructions of the manufacturer, vendor or supplier, on assembly, the use and removal of equipment, unless such transactions are carried out or in conditions or circumstances not covered by those instructions.

  • Currently, the CE marking is not applicable to tubular scaffolding, since the existing European legislation that governs (rules UNE-EN 12810-1,2,3 and UNE-EN 12811-1.2 ) does not require the marking, and refer to products not covered by any existing Directives again approach (fundamental requirement to incorporate the CE).
  • Remember that is so wrong without CE marking to market a product covered by any of the European Directives require, how to incorporate the CE marking on a product that is not susceptible to wear.

The General Directorate of Labour and Social Affairs , in order to inform the main stakeholders, in 2005, issued a briefing note which highlighted that the current inability to prefabricated scaffolding above, known as tubular scaffolds or cranes, they can enforce the requirement of obtaining CE marking, as there is no agreement yet European Union concerning the marketing of them, so that the tubular scaffold presented above should always incorporate a Plan for assembly, use and removal, according to what emerges from the Royal Decree 2177/2004.

This meant introducing new practice in day to day business of scaffolding:

1. Need incorporation of qualified personnel to carry out the erection plan.

(Royal Decree requires careful Plan by a trained person university that will enable him to do so. Such training seems evident that it must be related professionals involved in the construction, ie, engineers, Engineers, Architects and Technical Architects.)

2. additional cost. The preparation of the plan is seen as a separate service, especially when signing a college should ensure coverage of liability insurance, so these plans must visarse assembly.

3. Variation in delivery times. The realization of this plan will need time to preclude the assembly of scaffolding from one day to another.

In order to simplify as much as possible "novelty", the Labour Inspectorate, in their note stated:

(...) certain product certifications under the current European standards (issued by agencies such as AENOR, AFNOR, etc) available to certain manufacturers may be likened to a CE, and exempt the Assembly Plan, if the scaffold is mounted under to the manufacturer's instructions. But in any case not exempted from the inspection or the mounting direction. Nor does it exempt in the case of scaffolds over 24 m crown height, scaffolding since they are not collected by the standards listed above, in which case the Plan required for assembly, use and removal (with rating calculations included).

Note:

  • The product certification is a process that verifies that a product meets the required standards and market-relevant which is intended. These standards can come included in laws, UNE, etc.
  • In some markets where certification is required by law, then called approval (such as scaffolds in Germany) and other markets is voluntary, as in English.

short:

Spain While scaffolding certification is voluntary, it follows from the above that greatly facilitates the daily work with scaffolding, as it relieved in many cases the completion of assembly drawings.

References:

0 comments:

Post a Comment